Not enough has happened to give you your much needed daily blog, but I suppose it's about time to fill you in on the happenings around here.

Last week, we got a call from Sherrie telling us that since we had a roof on our house it would be a good idea to look into locking our rate.  Originally, we had been quoted a 4% interest rate, but when Adam talked to Dean (our NVR Mortgage Rep) the rate was down to 3.75% and there was a cash back towards closing incentive.  We were pretty excited about that, because we weren't expecting any incentive and it'll take our monthly payment down about $20 which is really nice.  In order for us to lock in our rate, we had to give Dean a "closing date" which we hadn't been able to get out of John (Proj. Manager) yet.  After some prompting he finally gave us March 28th or 29th.  Ugh.  Totally not what we wanted to hear.  That'll give us about 2 days to move and clean the house we're in now.  Hopefully they get their little heinies in gear and make up for lost time. 

When Adam talked to John about the closing date, he also told us we'd have our pre-drywall meeting this Friday, Feb 24th (or next Monday - depending on if they'd be able to get all of the inspections they needed done today since it's a holiday - lets hope for Friday)!

Before our pre-drywall meeting we were supposed to meet with Guardian and do a walk-through with them to discuss where the cable and internet jacks would go, along with Adam's speakers, subwoofer, etc.  We actually e-mailed Sherrie last night asking her to give us Ron's contact information (our Guardian contact) so we could set up a time to meet with him.  This morning, before we even got a response from Sherrie, Adam got a phone call from Ron saying one of his men was at the house and needed one of us to go do the walk through.  Talk about last minute! Guess it wasn't just us, though.  Ron got a phone call this morning, too, saying it was time for Guardian to get over there and work their magic. Luckily, I'm off work today for the holiday and was able to race up there.

The walk through with Jeff (from Guardian) was barely 5 minutes.  Guess technically we didn't have to be there, but it was nice to see the house in the daylight (and walk through it legally - haha).  I had my mom meet me up there and we walked around inside and outside for a bit, talked to one of the workers (Ian, who was very nice).  It was funny, when we left there were only 3 people working on the house (two guys working on the heat and a/c ducts, and Jeff from Guardian).  I went over to my mom's to grab lunch, and an hour later when I drove past on my way home there was a semi-truck in the driveway from an electrical company, another van for heating and a/c, and the Guardian van.  I guess they plan on getting a lot done inside today!

There hasn't been too much visible progress on the house (at least not from the outside).  Since I've last updated, they've finished the roof and garage and finished putting in all of the plumbing rough-in's as wells as our bath tubs.  I'm pretty excited to see what's been done today when we drive by again later tonight! I'll probably update again after the pre-drywall meeting.  In the meantime, here are some pictures to enjoy :-)
 We've got a garage door (see below)!
 The next picture shows the completely finished roof (over garage and front door, as well)...
The following pictures are just random plumbing pipes that are run throughout our house.  I thought it was pretty neat. It reminded me of Blue Man Group - but not as fun.  And you couldn't talk through one tube and have someone hear you through another tube on the other side of the room. 

 Here is our extra bathroom tub!
 And last, but not least, is a picture of me standing in my tub! Oversized masterbath soaking tub.  Sighs.  I can't wait.  For my birthday my mother-in-law and sister-in-law got me lots of things to use for my new tub - bubbles, wine, candles, chocolate, new towels, etc.  Can't wait!

Thursday, February 9, 2012

You Make a Better Door than a Window

Talked to our Project Manager today; he said everything is coming along nicely.  Our closing date should be late March (hopefully not too late in March - we need a place to live!) and we should have our pre-drywall meeting week after next!

I asked John about how many people were working on our house so I could drop off coffee and donuts one morning and he said that on some days there could be up to 50 people! I couldn't believe that! The most I've seen working on the house at a time are seven.  Maybe they're sneaky and quick like ninjas?  Who knows. 

Today, when Adam and I went by the house the biggest difference we saw was that they put in most of the windows and doors.  That was it.  But hey, doors and windows are important!

I really am very excited about our Morning Room.  It looks really nice and I'm so glad that we got that incentive - I can't imagine our house with out it.

Check out that sliding door! Sadly, it's not on the tracks so we couldn't close it.  I'm sure they'll fix that though, right? Here's hoping!

That's about it for Day 3 of framing! Toodles!

Wednesday, February 8, 2012

Raise the Roof!

The roof... the roof... the roof is on our house! Woo! We decided to illegally go inside again but went one level higher - literally! We very sneakily (and verrrrrry carefully) went upstairs! We got to see all of the rooms and they even put the bathtubs in their appropriate bathrooms! We even got to stand in our bedroom... but then the floor creaked and I freaked out so we went back downstairs.  But either way, more progress and happiness! Yay!

Tuesday, February 7, 2012

The Glorious Erection (...of our house... sheesh)!

Here ye, here ye! We actually have a house (kind of)! There hasn't really been much to update you all on since ground breaking.  Honestly, not really sure what they've been doing for the past two weeks other than piling up some dirt and digging a hole.  Yesterday, they finally poured our foundation and today, they started framing our house! It's absolutely incredible how much they accomplished in 8 hours.  It went from being just a slab of concrete and now they have the entire bottom floor framed, and have started the top floor as well! We've driven by every day since our groundbreaking, and today we finally were able to see something! Here are some pictures from the entire progress (from right before ground breaking to today).

The first picture is our plot of nothingness with the bunch of sticks in it (which I mentioned in an earlier post - not pictured are the orange pillows on the street). 
 This next picture is what happened after ground breaking.  Lots of dirt piles and bricks.  Woo.
In the picture below (you can't really tell, but...) the foundation is poured and the ground is leveled out.  We've been looking at pretty much this picture for the past week or so.  A whole lot of nothing to look at, but apparently the guys had been there every day doing... something...?
And now... A HOUSE! Ta da! Isn't it beautiful? I illegally ran inside the house (in the morning room - Adam reluctantly followed me) to get a peak.  It was awesome! We could see our pantry and our stairs and other parts of the house barely being held up by one beam!
So, now that they've started framing there should be some serious blog updates from now on! Pretty soon we should meet with our Project Manager and get a walk-through before dry wall goes up, and we'll also meet with Guardian to talk about where all of our outlets and such go! So ready! Hooray! Peace out.

Wednesday, January 18, 2012

And we shall call this land... this land...!

Groundbreaking (take one million and three) was rescheduled for this past Tuesday.  Unfortunately, we woke up to thunder and lightning and rain (oh my - and in January, at that)! With that being said, they pushed back our groundbreaking (again) to today - Wednesday.  We drove past the lot yesterday and while they didn't "break ground" they were able to put in about half of our temporary driveway and they dug up some of the sod where the house will be placed.  Not really sure why that wasn't considered breaking ground, but whatever.  At least they did something, and that's more than we've seen in a week! 

We got the call today that they were officially excavating and they should be able to get the footer inspection by Thursday and then they'll lay down the first layer of cement.  Yay! We are so happy that the ball is finally rolling and our house is in the makings! It feels like we've been waiting forever! We officially have a huge ass muddy hole in our lot and couldn't be more excited!

Thursday, January 12, 2012

Meeting with the Project Manager

On Monday we were so incredibly excited for what the week would bring.  That afternoon we had our meeting with our Project Manager (John) and we were scheduled to break ground on Wednesday.  Things haven't necessarily gone as planned. 

During our meeting with John, we basically exchanged contact information and went over the house layout, options, etc.  While looking at all of the papers, I noticed that they (once again) had our house as a "Garage Right" instead of a "Garage Left".  We had been told about a week before Christmas that our house layout had been swapped, so after the New Year (during all of those fantastic holiday sales) we went out and bought a sectional couch (yay new furniture for our new house)... for a Garage Left layout.  Blerg! Lucky for us, we were able to call and switch our sectional so it'll fit in our "Garage Right" house layout.  Oh horrah. 

Anywho, that was just one little glitch (which was more surprising to us than it was actually a problem).  While at the meeting, John told us that our ground breaking, which had been scheduled for Wednesday, may not happen on Wednesday.  Apparently, due to the holiday back ups, he hadn't yet received our permit.  He said that if he received it on Tuesday they'd be ready to go on Wednesday.  Tuesday came and went and we didn't hear from John.  Adam called him on Wednesday and he said that he did, in fact, get the permit, but because of the rain, he was trying to decided whether to start on the house Thursday or Friday, or to just wait until Monday.  He was either hoping the rain would stop and he would start before the weekend or he'd just wait it out until Monday. 

...Then today came the snow.  Le sigh.  I guess now we're schedule to break ground on Tuesday? Almost a week after our first scheduled time.  But Adam isn't worried and neither is John.  And John has assured us that although breaking ground has been delayed about a week, it should (hopefully) only push back our closing by 1-2 days.

Fingers crossed the weather doesn't screw us over anymore...

On a happier note, it at least looks like they're about to do work on our lot! Adam and I drove by on Tuesday and there are about 20 marker sticks in the ground (which we're assuming were marking off where the slab should go? Or something else extremely important, I'm sure) and there were also these giant orange body pillow type things near the side of the road kind of sectioning off our property line.  Woo.  Progress.  Now we don't just have grass to look at, we have sticks and pillows, too!

I guess that's it for now.  I'll check back in on Tuesday!

Monday, December 26, 2011

Options and Incentives!

We haven't really had any meetings with Ryan Homes this past month to update you on, but we do have our pre-construction meeting scheduled and a tentative date for groundbreaking (as long as weather is cooperative) - January 11th!  In two short weeks they should start building our home! It's taken forever to get to this point and we're going crazy trying to imagine everything that we've chosen for the house or what we want to do with it.  We just want to see it already (oh, and live there, too, I suppose)!

We thought we'd give you a little insight of what options we've chosen for the house:

Once we were finally able to meet with Rite Rug we picked out our downstairs tiling (cinnamon), tilling for our laundry room and upstairs bathroom (creme),  tiling for our master bathroom (peacock) and carpeting for the entire house (thornwood).  Below are the pictures (in the order of mentioned above). 




We also picked out all of the colors/designs for the exterior part of our house (which Adam mentioned in his earlier post).  Unfortunately, we don't have any great pictures of those options (since they were taken inside with my cellular device, and I haven't yet found any pictures online), so you'll just have to use your imaginations! Like we've said earlier, we've upgraded to "Elevation B" (which is basically a peak over the front door, it just looks nicer!).  We just found out this week that we're getting a garage left, so any pictures you see of "Elevation B" imagine it flipped.  Poor Adam has been working on floor plans with furniture and everything and will have to do it all over again! It'll be weird actually seeing it, since the model we've seen and are used to is garage right.

Anyway, on the outside of our house we're getting Stone Mountatin Clay siding (which is a darker tan color), Brown Shutters (Poo Brown like the Cleveland Browns), a Vineyard Red Door (which I really wanted! That way, when people come to visit we can say, "We're the house with the red door!" and it'll be really easy to find), and Aspen Cobblestone (a bunch or rocks stacked up on each other with hints of reds and tans and grays).  We had the option of choosing between brick or cobblestone, but since Huber Heights is the largest brick community, we thought we'd change it up a bit!

We did receive a few incentive upgrades due to using NVR Mortgage - we're getting granite counter tops in the kitchen (tan brown) and upgraded cabinets (maple).  We've oddly become very excited about the granite counter tops! We're not sure why, but we know it'll look pretty awesome and will keep better than any other option.  Another incentive we received was getting the addition of a morning room at no cost, which really opens up the first floor! It'll be nice to have that extra space, especially down the road. We're also getting a stainless steel french door refrigerator added into the mix. Y'know... the fridge that has the two doors on the top, and the drawer freezer on the bottom.  So excited! Right now we have a side-by-side and the freezer barely holds anything... in a few months we'll be able to have pizzas in our freezer! Woo!

We also opted to purchase some things make our house ahhhh-mazing.  The first option we decided on was upgrading the stove to a flat top stove with a range microwave.  We have a flat top stove in our house now and absolutely love it; it's easy to clean, you don't have to worry about the coil elements getting all wonky or not sitting level.  The second upgrade is my absolute favorite <3.  I have dreams of this upgrade and can't wait until the day we move in so I can use it! That's right, we're getting the over sized bathtub in the master bath! Yay! It's deeper and wider and perfect for bubble baths! It'll be nicer for showering, too, once we get one of those curved shower curtain rods! The third option we're getting is having the equipment installed to have an automatic garage door opener with buttons and the exterior keypad.  We thought about doing it ourselves, but with the cost of equipment and the complexity of installation, it just seemed like the better choice.  The fourth option, which isn't all that exciting, is a ceiling fan rough-in in the master bedroom.  Basically, they'll put an overhead light in the room (which there are none of in any of the bedrooms) that is also ceiling fan compatible.  The final option we're getting is Adam's baby - surround sound in the ceiling of the Great Room (aka Living Room).  He'll have update about that himself since I'd probably not do it justice and don't understand all of the ins and outs of it all.  All I know is there will be speakers in the ceiling and sound will come out! Haha. 

That's it for now! If I forgot anything I'll let you know.  We'll update again in two weeks!